Blake Island State Park Marina Improvements Pre-Design

Client: Washington State Parks

DCG is providing all engineering services related to a comprehensive look at facility needs through a pre-design process. The Blake Island marina project proposes to dredge sand and sediment from the entrance channel and Blake Island Marina; replace moorage piers, floats, gangways, boat pump out platform, and access routes to comply with federal accessibility requirements within the marina; examine reconfigurations of moorage to be more efficient and flexible; examine breakwater improvements; remove creosote from the pier/marina; and construct a permanent cargo ramp for the maintenance vessel.